A company produces two types of belts A & B with a profit of Rs 2 and Rs 1.50 respectively. Belt of type A needs twice as much time to make as belt type B . The company can produce at the most 1000 belts of type B per day . Material for 800 belts is available per day . At the most , 400 buckles for belt type A and 700 for belts type B are available . Then the appropriate LPP is :
A company produces two types of belts A & B with a profit of Rs 2 and Rs 1.50 respectively. Belt of type A needs twice as much time to make as belt type B . The company can produce at the most 1000 belts of type B per day . Material for 800 belts is available per day . At the most , 400 buckles for belt type A and 700 for belts type B are available . Then the appropriate LPP is :
Solution
✅ Correct Option: 4
Let x = belts of A, y = belts of B.
Material constraint: .
Buckles: , .
Time: A takes twice the time of B; if B's max is 1000, then .
Objective: Maximize Z = 2x + 1.5y.
Non-negativity: .
Related questions:
2022: 25 May Shift 1
2023: 11 Aug Shift 1
2023: 30 May Shift 3
2023: 7 June Shift 1