Skip to main contentSkip to solution

Match List-I with List-II

List-IList-II
(A) Total Cost (TC)(I) Total variable cost/ Quantity (TVC/Q)
(B) Average Variable Cost (AVC)(II) Total Fixed Cost / Quantity (TFC/Q)
(C) Short run average cost (SAC)(III) Total Variable Cost + Total Fixed Cost.
(D) Average fixed cost (AFC)(IV) Average Variable Cost + Average Fixed Cost.

Choose the correct answer from the options given below:

Solution

✅ Correct Option: 4

TC=TVC+TFCTC = TVC + TFC (III); AVC=TVC/QAVC = TVC/Q (I); SAC=AVC+AFCSAC = AVC + AFC (IV); AFC=TFC/QAFC = TFC/Q (II).

Keyboard Shortcuts

  • Left arrow: Previous question
  • Right arrow: Next question
  • S key: Jump to solution
  • Q key: Jump to question