Match List-I with List-II
List-I List-II (A) Total Cost (TC) (I) Total variable cost/ Quantity (TVC/Q) (B) Average Variable Cost (AVC) (II) Total Fixed Cost / Quantity (TFC/Q) (C) Short run average cost (SAC) (III) Total Variable Cost + Total Fixed Cost. (D) Average fixed cost (AFC) (IV) Average Variable Cost + Average Fixed Cost.
Choose the correct answer from the options given below:
Match List-I with List-II
| List-I | List-II |
|---|---|
| (A) Total Cost (TC) | (I) Total variable cost/ Quantity (TVC/Q) |
| (B) Average Variable Cost (AVC) | (II) Total Fixed Cost / Quantity (TFC/Q) |
| (C) Short run average cost (SAC) | (III) Total Variable Cost + Total Fixed Cost. |
| (D) Average fixed cost (AFC) | (IV) Average Variable Cost + Average Fixed Cost. |
Choose the correct answer from the options given below:
Solution
✅ Correct Option: 4
(III); (I); (IV); (II).