Which of the following step is not the part of the downstream processing?
Which of the following step is not the part of the downstream processing?
Solution
✅ Correct Option: 3
NCERT describes downstream processing as separation and purification of the product, formulation with suitable preservatives, and then strict quality control testing. Quality control testing is therefore a required part of downstream processing, so "no quality control testing" cannot be one of its steps.
Option 4: clinical trials look unrelated to processing, but NCERT lists them as part of downstream processing for products such as drugs, along with quality control testing.
Related questions:
2026: 22 May Shift 2
2025: 22 May Shift 2
2025: 29 May Shift 1
2026: 20 May Shift 2
2025: 13 May Shift 2